Experiences/Pengalaman

Our Company has wide experiences in the business of Masterclock, digital clock, sattelite clock and also synchronization clock since its birth in the year 2000. We have involved in many national; and also international projects in Indonesia. Most of them are Time Critical Application facility.

We also experiences in Information Technology project like VSAT systems, Data cable, fibver optic cable, cable tray and accesories, computer server, telecommunication fascility for Power plant project, Airport project, Industrial plant, refinery, rail way stations, etc.

Our company responsible for important TOTAL SOLUSION starting from  Engineering design proposal, Equipment Selection, Procurement, Field Installation, Test and Commissioning and Site Acceptance Test and also after sales maintenance.

PT. Srikandi Cahya Mustika sudah berpengalaman sejak berdirinya tahun 2000 dalam business Masterclock, Digital Clock, Jam Satelit serta Synchronisasi Clock. Sudah terlibat dalam berbagai project nasional maupun internasional di Indonesia. Hampir kesemuanya adalah Time Critical Application.

Kami juga berpengalaman di area Information Technology project seperti VSAT systems, Data cable, fiber optic cable, cable tray and accesories, computer server, telecommunication fascility untuk Power plant project, Airport project, Industrial plant, refinery, rail way stations, etc.

Perusahaan kami memikul tanggung jawab TOTAL SOLUSI yang penting dimulai dari Design Engineering Proposal, Pemilihan Peralatan yang tepat, Pengadaan Barang, Instalasi Lapangan, Test Commissioning maupun Site Acceptant Test serta perawatan purna jual.


Project Experience List/ Daftar Pengalaman Project

We are professional engineering services for Oil & Gas, Refinery, Offshore Platform, Airport, Railways, Shipyard, Industries, Power Plant, Geothermal, Banking, Office Building, Apartment etc. We offer engineering, field installer, test and commission services. Not only in Jakarta area but we works all over the country. Below is a list of our major project experiences as sub contractor or main contractor:

Perusahaan kami adalah profesional engineering company yang menjual jasa kepada dunia Minyak & Gas, Kilang Minyak, Anjungan Lepas Pantai, Bandara, Stasiun Kereta Api, Galangan Kapal, Industries, Pembangkit Listrik, Panas Bumi, Industri Perbankan, Gedung perkantoran, Apartement dll. Bidang layanan engineering, Instalasi lapangan, testing serta commissioning. Tidak hanya di sekitar Jakarta namun kami melayani juga luar pulau dimanapun pekerjaan itu ada. Projek-projek utama yang pernah kami selesaikan baik sebagai sub-contractor maupun langsung adalah:

1. Muara Tawar Gas Turbin Power Plant Unit III, Bekasi Jawa Barat. Gai-tronics Maintenance Telephone, Bodet Industrial Clock System. Main Contractor: Siemen-Samsung-BBSI JO, 2004. Siemens Indonesia

2. Minangkabau International Airport, Padang Sumatra Barat. Motorola Integrated Ground Communication System. Motorola UHF FM, Fire Fighter, Main Contractor: Shimizu-Adhikarya Marubeni. JO . 2004

3. TTC Testbed, Gedung Telkomsel Buaran Jakarta. Perangkat: cable Tray dan Cable Ladder System. Main Contractor: PT. Hitek Sukses Makmur. 2005

4. PT. Exelcomindo Pratama BTS Tower 70 M, Cikijing Kuningan Jawa Barat. Subcontracor from Contractor: PT. Hitek Sukses Makmur. 2006

5. Daradjat Geothermal Power Plant, Garut Jawa Barat. Perangkat: Gai-tronics Multiparty Public Address System. Data and Telephone cable system. Main Contractor: Thiess Contractor Indonesia. 2007

6. Muara Tawar Pembangkit Listrik Gas Uap Unit I. Perangkat: Perbaikan Industrial Clock System Bodet. Sub Contractor: PT. Hitek Sukses Makmur. 2007

7. Pembangkit Listrik Gas Uap Muara Tawar Unit I Bekasi Jawa Barat. Pekerjaan: Pemasangan Gai-tronics Multiparty Paging System. Sub Contractor: PT. Hitek Sukses Makmur. 2008

8. OTO Bappenas Jakarta. Pekerjaan: Distance Learning, Teleconference, AC, grounding. Sucontractor from PT. Sarana Informatika Utama. 2007

9.Carefour Cempaka Mas, Bekasi Timur, Cikarang. Pekerjaan Cable Data for EDC Networks, PT. Jatimas Samudra Artha, Carefour Project 2007.

10. Pembangkit Listrik Tenaga Uap, Rembang, Pekerjaan instalasi PC, Server, printers, Notebooks dan Jaringan Komputer, 2007-2008.

11. Proyek Pembangkit listrik Tenaga Uap Rembang, Instalasi Access Door, 2007-2008.

12.. Pertamina UP VI Balongan Indramayu, Pekerjaan Instalasi Gai-tronics Public Address, survey dan Maintenance. 2007-2008.

13. Instalasi Bodet Master Clock, Slave Clock untuk Gardu Induk di PLN Sub-contractor from PT. Hitek Sukses Makmur 2008-2009..

14. Supply Hewlet Packard Servers, Monitors, UPS, Printers for Project PLN Medan, PT. Multitech Yasa Guna, Jakarta 2008-2009.

15. Supply Gai-tronics spareparts PT. Miko Jakarta, 2009

16. Testing Jaringan Cable Master Clock System, Instalasi Masterclock System serta Programming Gedung bertingkat. Proyek Master Clock System Menara BTN. Jakarta, 2010. PT. Maco Centris Sakti,

17. Programming, Installation, Testing and Commissioning, Bodet Master Clock System for Mopah Airport, Sub-contractor PT. Hitek Sukses Makmur, Merauke Papua 2011

18. Programming, Installation, Testing and Commissioning, Bodet Master Clock System for Dominic Osok Airport, sub-contractor from PT. Hitek Sukses Makmur, Sorong Papua 2011

19. Bodet Tower Clock System, Menara Alam Sutera Tangerang Banten, Design, Install, Testing and Commisioning, sub-contractor PT. Hitek Sukses Makmur, Tangerang 2011

20. Bodet Master Clock system for KPK Building, sub-contractor PT. Hitek Sukses Makmur, Jakarta, 2011 21. IT, Communication and Data Networking: PC, Notebook, Server, Printer, PABX Telephone, Internet Access, Structured cable system, Telephone, fax etc. owner PT. Schulz Indonesia. Jakarta 2011

22. CCTV for Toyota, Jakarta 2011

23. Bodet Masterclock System, Slave Clocks, Motorola Two Way Radio System, sub-contractor from Posco Engineering, Korea, owner Merak Energy Indonesia 2x60 MW Project 2012

24. Bodet Master Clock System, NTP Slave Clocks, GPS Reception, Installation Test and Commissioning, Medan Baru International Airport Project, Kualanamu, Sumut, 2012. Sub-contractor PT. Hitek Sukses Makmur

25. Bodet Master Clock For Jakarta Railways Systems, Maintenance, Repair and Renew Old Master Clock Systems: Manggarai, Cikini, Gondangdia Lama and Gambir Stasions. owner PT. Kereta Api Indonesia, 2012

26. Flashing Beacon for Gas Booster Pump Project, Kalimantan sub-contractor. KPM Oil & Gas. Owner TOTAL INDONESIE, 2012

27. Bodet Master Clock System, Supply - Maintenance and repair, Muara Tawar Gas Turbine Power Plant, PT. Siemens Indonesia 2012

28. Bodet Tower Clock, Gambir Stasion, PT.Kereta Api Indonesia DAOP 1 Jakarta 2012. Owner PT. Kereta Api Indonesia

29. Bodet Slave Clock, MENARA BTN JAKARTA, PT. ARTHA VISTA, 2013

30. ICT SUPPORT SYSTEMS maintenance contract for IT SUPPORT OUTSOURCING PC, LAPTOP, NETWORKS LAN, PRINTER, STORAGE, NETWORK ATTACH SERVER, PABX, WIFI, BACKUP SOFTWARES, ANTI SPAM, ANTI VIRUS, SECURITY SYSTEMS ETC. PT. Schulz Indonesia 2012 -2014

31. SUPPLY FLEXIBLE WAVEGUDE for SEATEL 9797 Antenna, Offshore Oilfield platform. ESSAR OILFIELD SERVICES,Mumbai-400070 Maharashtra India 2013.

32. Gai-tronics PAGA maintenance services, Merge Isolate Cabinet, Multiparty Stasion, Amplifier, speaker, networks, assestment and test commisioning, Muara Tawar GTPP Unit I&II, 2013. PT. PJB Muara-Tawar.

33. Masterclock System upgrade MUARA TAWAR GTPP, PT. PJB - Unit Muara Tawar Gas Turbine Power Plant Block 1 & 2, BEKASI JABAR, Des. 2014. Bodet, SA.

34. Maintenance Service Contract  ICT System, PT. Schulz Indonesia, 2015

35. Maintenance Masterclock System Muara Tawar Gas Turbine Power Plant Block 3, December 2016.

36. Maintenance Service Contract ICT System, PT. Schulz Indonesia, 2016

37. Gai-tronics Clean Telephone System, Design, Procure and Installation Testing, PT. Widatra Bhakti, Pasuruhan 2017

38. Masterclock Inc. USA, Masterclock Systems for Geothermal FCRS and Power Plant,  Pertamina Lumut Balai South Sumatra, 2017

39. Maintenance Contract ICT Systems, PT. Schulz Indonesia, 2017

40. Integration Test Masterclock Inc Slave Clocks with other brand Masterclock, Test and Commisioning Services, Lumut Balai Geothermal FCRS and Power Plant, Pertamina Lumut Balai, Januari 2019.

41. Masterclock systems for Tanjung Jati B Power Plant Unit 5&6 Project. Integration with multibrand systems, Test Commissioning and SAT. Toshiba Asia pacific Indonesia for PT. Bumi Jati Power November 2019.

42. Analog Slave Clock Merak Energy Indonesia, Banten, Jawa Barat, January 2020

43. GMR1000, Alpha Numeric Digital Clock, Masterclock Systems,. Lombok Power  Plant Project, June 2020

44. Analog Slave Clock systems for Tanjung Jati B Unit 5&6 Power Plant Project includes installation and Test Commissioning, SAT. PT. Toshiba Asia pacific Indonesia. for PT. Bumi Jati Power 2020

45. GMR5000 Multifunction Grand Master Generator, GNSS Antena, Receiver, Digital Clock, Supply Install Test and SAT, Pure DC Data Center, PT. Schneider Indonesia, Bekasi 2022.

46. GMR1000 Multifunction Grand Master Generator, GNSS Antena, Digital Slave Clock, Supply Install, and Test, SAT, Halmahera Power Plant, Maluku, PT. Nutech Integrasi,  PLN, 2023.