1. Muara Tawar Gas Turbin Power Plant Unit II, Bekasi West Jawa. Gai-tronics Maintenance Telephone, Bodet Industrial Clock System. Main Contractor: Siemen-Samsung-BBSI JO 2004
2. Minangkabau International Airport, Padang West Sumatra.  Motorola, Integrated Ground Communication System. Motorola UHF FM, Fire Fighter, Main Contractor: Taiyo Sinar Raya Teknik, Shimizu-Adhikarya Marubeni JO, 2005
3. TTC Testbed, Telkomsel Building Buaran Jakarta. Cable Tray dan Cable Ladder System.  2006
4. PT. Exelcomindo Pratama BTS Tower 70 M, Cikijing Kuningan West Jawa.  Flextronics Networks Services Indonesia, 2006
5. Chev34. Upgrade system Masterclock Systems,  Muasra Tawar GTPP, 2014ron, Daradjat Geothermal Power Plant, Garut Jawa Barat.  Install supply test and commissioning PAGA Gai-tronics Multiparty System. Data and Telephone cable system. Main Contractor: Thiess Contractor Indonesia. 2007
6. Muara Tawar Gas Fired Power Plant Unit I.  Maintenance Industrial Clock System Bodet. Main Contractor: PT. Hitek Sukses Makmur, 2007
7.  Gas Fired Power Plant Muara Tawar Unit I Bekasi West Jawa. Instalation Gai-tronics Multiparty Paging System. Main Contractor: PT. Hitek Sukses    Makmur, 2008
8. OTO Bappenas Jakarta. Installation Distance Learning, Teleconference, AC, grounding. Main Contractor: PT. Sarana Informatika Utama, 2008
9.Carefour Cempaka Mas, Bekasi Timur, Cikarang.  Installation  Electronics Data Capture ( EDC) Networks, PT. Jatimas Samudra Artha, Carefour Project 2008
10. Steam Powered Power Plant, Rembang,  PC Server and Networks, Zelan - Priamanaya JO 2008
11. Pertamina UP VI Balongan Indramayu, Maintenance, repair, Installation PAGA including side survey plan and Maintenance. 2007-2008.
12. Installation Bodet Master Clock for Power Grid in PLN Medan, PT. Hitek Sukses Makmur 2008-2009.
13. Supply Hewlet Packard Servers, Monitors, UPS, Printers for Project PLN Medan, PT. Multitech  Yasa Guna, Jakarta 2008-2009
14. Supplly Gaitronics Speaker Amplifier and station, PT. Miko Jakarta, 2009
15. Intallation Bodet Master Clock System for Menara BTN Jakarta, 2010
16. Master Clock System for KPK Building, Jakarta 2011
17. Master Clock Systems for Eduard Osok Airport Sorong, Papua 2011 
18. Master Clock System for Mopah Airport Merauke Papua, 2011
19. Tower Clock for Alam Sutera Tangerang, Banten, 2011
20. IT Insfrastructures, Computer, Laptop, Server, Printer, LAN Networks, Wireless LAN, Cisco, NAS, Softwares etc, PT. Schulz Indonesia, 2011.
21. CCTV systems for Dapen Toyota Jakarta, 2011
22. Masterclock Systems and Radio Communication for Posco Engineering, Korea. Merak Energy Project, 2012
23. Maintenance for Clock System, Railway Station Systems Jakarta, PT. Kereta Api Indonesia DAOP 1, 2012
24. Clock System, Bandara International Medan Baru Kualanamu, Medan Sumatra Utara, PT. Hitek SUkses Makmur, 2012
25. Cabling System for VOIP/Data System, PT. Berlian Laju Tanker Jakarta 2012
27. Flashing Beacon Light for Total Senipah Project Balikpapan, PT. KPM Oil and Gas, 2012
28. Clock System Muara Tawar Gas Turbin Power Plant, Siemens 2013
29. Clock System, Gambir Station, Jayakarta Station, Manggabesar station, Kota Station PT. Kereta Api Indonesia, 2013
30. Bodet Slave Clock, MENARA BTN JAKARTA, PT. ARTHA VISTA, 2013
31.  ICT SUPPORT SYSTEMS maintenance contract. PT. Schulz Indonesia 2012 -2014
32. SUPPLY FLEXIBLE WAVEGUDE for SEATEL 9797 Antenna, Offshore Oilfield platform. ESSAR OILFIELD SERVICES,Mumbai, Maharashtra India 2013.
33. Safety Radio and Paging System, PT. PJB - unit Pembangkit Muara Tawar, 2013
34.Upgrade Masterclock Systems,  Muara Tawar GTPP, 2014
35. Contract Maintenance ICT Facility PT. Schulz Indonesia, 2015 - 2016
36. Maintenance Masterclock Systems Muara Tawar GTPP Block 3, 2016
37. Clean Room Telephone, PT. Widatra Bhakti, Pasuruhan Jawa Timur, 2017-2018
38. Clock System, Masterclock Inc. USA. Lumut Balai  Geothermal Power Plant Project, Pertamina - IKPT, Toshiba Eng. South Sumatra. 2018
39. Masterclock Systems, Tanjung Jati B Unit 5&6 PT. Toshiba Asia Pacific Indonesia - PT. Bhumi Jati Power Jepara Jateng, 2019, 2020, 2021, 2022
40. Masterclock Systems, Lombok Power Plant, PT. PLN - PT. Megayasa Teknologi, 2020
41. IT Maintenance Contract, PT. schulz Indo Mandiri 2019, 2020, 2021, 2022
42. Masterclock Systems, GMR5000, HSO2, NTDS26, GNSS Antenna, Jabiru Data Center Unit 1, Project February - December,  2022
43. Masterclock Systems GMR-1000, GNSS Antenna, NTDS 26, Halmahera power Plant, PT. Rekadaya Electrika - PT. Nutech Integrasi, March 2023.
44. Tower Clock, JAM MENARA For Pasar Rakyat Batavia 2 Riverwalk Island, PT. Kapuknaga Indah, Agung Sedayu Group PIK2 Jakarta, 2024 - 2025.

45. NTDS Slave Clock for Star Energy Geothermal Sukabumi Jawa Barat,  2026